Back to car page
Model brief

AITO M9 BEV Max AWD

Photos, catalog data and tools for this model. Owner instructions are under review; match the trim, year and market to the manufacturer's manual.

Catalog data for this model

Figures reflect the catalog trim; actual range varies with speed and temperature. The reference price is not a sales offer.

Powertrain
Battery Electric
Battery
100 kWh
Peak DC charging
TBA
Reference price from
28,000 KWD

A closer look

In detail

1 / 10

Source: AITO / SERES official media

EV Gulf Video HubA dedicated video for every guide car

Watch the AITO M9 BEV Max AWD

1 OEM video + an EV Gulf spec film

Range630 km
Battery100 kWh
Power523 HP
0–1004.5 s
AITO M9 BEV Max AWD 2025

AITO M9 BEV Max AWD 2025

Photo film · 1 / 10

EV Gulf
The numbers that matter here
At 130 km/h350 km56% of the official figure — 274 Wh/km · modeled, not measured
Same speed, 45°C summer273 kmHeat Score 64/100 — Fair
10 minutes of charging+122 kmFrom the claimed 15-minute charge
A full charge at home≈ 10 hOn a 11 kW wallbox — one overnight

Works for you in the Gulf

  • 150 km in 5 minutes of charging — the fastest in the AITO family
  • 4 LiDARs and the full M9 luxury package
  • Al-Futtaim dealer in UAE

Go in knowing

  • The priciest M9 — above German rivals
  • 630 km needs light planning for inter-city trips
What sets it apart

800V ultra-fast charging — 150 km in 5 minutes, 30-80% in 15

4 LiDARs and 36 sensors — the best-equipped perception suite in class

HUAWEI xPixel million-pixel headlights — project visuals up to 100 inches

Your actual trips

Does it get there on one charge?

Based on 273 km — this car's range at 130 km/h on a Gulf summer day, not the factory figure.

Kuwait CityDammam400 km
One charging stop
Kuwait CityManama (Bahrain)470 km
A few stops · 2
Kuwait CityRiyadh510 km
A few stops · 2
Kuwait CityDoha (Qatar)640 km
A few stops · 3
Kuwait CityKhafji115 km
On one chargearrives at 58%
Kuwait CityDubai (UAE)1,100 km
A long haul with stops · 5

Assumes sustained 130 km/h, Gulf summer heat, arriving with a 10% reserve, and charging 10–80% on the road. Stop counts are an estimate — charger availability on these corridors varies. Plan it on the map

Your next step

Agents and parts in your market